Setup step on the Production flow models page · Production control

Set up Production flow models

Use this page to set, for each model, whether work cell capacity is measured in throughput or hours, the EPE cycle, the planning period and time fence, and what happens when capacity runs short; a model must exist before work cells are defined.

Used by
Production manager, Production planner, Process engineer and 1 more role
Business process
Develop production processes
Menu item
LeanProductionFlowModel
Main table
LeanProductionFlowModel
Data entity
LeanProductionFlowModelEntity
Setup steps
1 on this page
Show what matters for
SETUP GUIDEHow to set it up8 sections. Choose a role to highlight what matters to you.
Everyone

1What it is and why

What it isA setup page where you define production flow models, which describe how the capacity of lean manufacturing work cells is calculated and maintained.
What you do hereUse this page to set, for each model, whether work cell capacity is measured in throughput or hours, the EPE cycle, the planning period and time fence, and what happens when capacity runs short; a model must exist before work cells are defined.
ExampleFor example, choose the Throughput model type so that a work cell's capacity is expressed in product quantities rather than hours.
Production flow models page in Dynamics 365
The page in Dynamics 365. page title tab to open what to set or check
Functional consultant · Solution architect

2Where it fits

End user · Functional consultant

3How to do it

About the examples: Examples and screenshots in this guide use BEAT, a demo company in a Dynamics 365 test environment. Use your own company's codes and values instead of copying them.

Setup steps on this page

Set up Production flow models

Use this page to set, for each model, whether work cell capacity is measured in throughput or hours, the EPE cycle, the planning period and time fence, and what happens when capacity runs short; a model must exist before work cells are defined.

Steps from Microsoft

  1. Go to Production control > Setup > Lean production flow > Production flow models.
  2. Click New.
  3. In the Production flow model field, enter an ID for the production flow model.
  4. In the Model type field, select Throughput type or Hours type.
  5. Enter the number of days in the EPE Cycle.
  6. In the Planning period type field, select an option.
  7. In the Planning time fence field, enter the number of days.
  8. In the Capacity shortage reaction field, select an option.

Source: Microsoft Learn

Fields on the page

FieldWhat it meansTable column
Production flow modelThe identifier of the model.Microsoft Learn Name
Model typeWhether work cell capacity is counted in product quantities (Throughput type) or in hours (Hours type).Microsoft Learn ModelType
EPE CycleThe number of days within which every part of the flow or work cell is produced at least once; used to schedule lean process jobs.Microsoft Learn EPECycle
Planning period typeThe period (such as days or weeks) that capacity is planned in; cannot change once the cell has reservations.Microsoft Learn PlanningPeriodType
Planning time fenceThe number of days ahead for which capacity reservations can be made on the related work cells.Microsoft Learn PlanningTimeFence
Capacity shortage reactionWhat automatic planning does when a day lacks capacity: postpone, cancel, add to the requested day, or distribute to available periods.Microsoft Learn CapacityShortageReaction

Test checklist

  1. Create a model with Model type, EPE Cycle, Planning period type, Planning time fence and Capacity shortage reaction.
  2. Assign it to a lean work cell and plan kanban jobs automatically.
  3. Check jobs are planned only inside the planning time fence and at Due date minus the EPE cycle.
  4. Overload the cell and check the Capacity shortage reaction (for example Postpone) is applied.
  5. Try to change Model type on the model and check it can't be changed.

Source: Microsoft Learn

Functional consultant

4Setup decisions

Setup stepRecommended value and whyDecision, common mistake and test
Set up Production flow modelsModel type chosen once per work cell type; Planning time fence about twice the average inventory lead time; EPE Cycle no more than half the planning time fenceLearn says the planning time fence is typically two times the average inventory lead time of the products in the flow or cell, and the EPE cycle should not be more than half the planning time fence.Should work cell capacity be measured in throughput or in hours?Picking the wrong Model type. It can't be changed on an existing model, and once a work cell has capacity reservations the planning period type can't be changed either.Test: Capacity shortage reaction Postpone
Solution architect

5Design impact

Shared or per companyShared: the same records are used by every legal entity. Microsoft data model
Can it be undoneOne-way: Warning: Model type can't be changed on an existing production flow model, and after a work cell has capacity reservations the model type and Planning period type are locked.
If you change it laterOnce a work cell using the model has capacity reservations, the model type and planning period type can no longer be changed. Microsoft Learn
Technical architect

6Technical

Menu itemLeanProductionFlowModel Checked in Dynamics 365
FormLeanProductionFlowModel Checked in Dynamics 365
TableLeanProductionFlowModelShown as “PRODUCTION FLOW MODEL” in Record infoKey field: NameChecked in Dynamics 365
Data entitiesLeanProductionFlowModelEntityLean production flow models Microsoft data model
Who can open itPrivilegesMaintain production flow models LeanProductionFlowModelMaintainView production flow models LeanProductionFlowModelViewDutiesMaintain kanban schedule KanbanScheduleMaintainEnable the kanban scheduling process KanbanScheduleProcessEnableEnable the production flow management process LeanProductionFlowMgmtProcessEnableInquire into production flow management policies LeanProductionFlowPoliciesInquire
4 security rolesProduction manager ProdProductionManagerProduction planner ReqProductionPlannerProcess engineer RouteProcessEngineerProcess engineering manager RouteProcessEngineeringManager
Checked in Dynamics 365
Roles to set it up and use itTo set it up or change itProduction manager ProdProductionManagerTo use itProduction planner ReqProductionPlannerProcess engineer RouteProcessEngineerProcess engineering manager RouteProcessEngineeringManagerGive people one of these roles. On this system, 4 roles can open this page.Checked in Dynamics 365
Developer

7Developer

Open it by URLhttps://<your-environment>/?mi=LeanProductionFlowModel
Integrate withLeanProductionFlowModelEntity data entity Microsoft data model
Data migrationLeanProductionFlowModelEntity (Lean production flow models): shared by all companies.Microsoft Learn
Table definitionLeanProductionFlowModel columns and relations Microsoft data model
Everyone

8Sources

To cite this step: PC-LEAN-030, Set up Production flow models. Beyond ERP Atlas Hub, 2026-11-11. https://www.beyonderp.cloud/atlas/step/PC-LEAN-030