Setup page · Warehouse management

Cycle count plans

A setup page where you define cycle count plans, which schedule recurring counts for specific items or locations at regular intervals.

Used by
Field Service Integration User, Production supervisor, Process engineering manager and 2 more roles
Business process
Manage warehouse operations
Menu item
WHSCycleCountPlan
Main table
WHSCycleCountPlan
Data entity
WHSCycleCountingPlanEntity
Setup steps
1 on this page
Show what matters for
PAGE GUIDEWhat the page does and how to use it8 sections. Choose a role to highlight what matters to you.
Everyone

1What it is and why

What it isA setup page where you define cycle count plans, which schedule recurring counts for specific items or locations at regular intervals.
What you do hereUse this page to plan recurring cycle counts, choose which locations and products they cover and how often counting work is created.
ExampleFor example, you can plan counts every five days for high-value items in a specific zone.
Cycle count plans page in Dynamics 365
The page in Dynamics 365. page title tab to open what to set or check
Functional consultant · Solution architect

2Where it fits

Business processManage warehouse operations
Menu pathWarehouse management › Setup › Cycle counting › Cycle count plans
Set up firstWork pools Microsoft Learn
Related pagesCycle count thresholds Microsoft Learn
End user · Functional consultant

3How to do it

About the examples: Examples and screenshots in this guide use BEAT, a demo company in a Dynamics 365 test environment. Use your own company's codes and values instead of copying them.

Setup steps on this page

Set up Cycle count plans

Use this page to plan recurring cycle counts, choose which locations and products they cover and how often counting work is created.

Steps from Microsoft

  1. Go to Warehouse management > Setup > Cycle counting > Cycle count plans.
  2. On the Action Pane, select New.
  3. Enter a Cycle counting plan ID and a Description.
  4. Enter the Maximum number of cycle counts and the Days between cycle counting.
  5. Select Save, then select Select locations to define which warehouse locations the plan covers.
  6. To narrow the items that are counted, select New in the plan lines grid and enter a Sequence number and a Description.
  7. Select Save, then select Define product query to specify which items the plan line covers.

Source: Microsoft Learn

Fields on the page

FieldWhat it meansTable column
Cycle counting plan IDA unique identifier for the plan.Microsoft Learn CycleCountPlanId
Maximum number of cycle countsThe maximum number of cycle count work records that the plan can create in a single run.Microsoft Learn MaxCounts
Days between cycle countingThe number of days between counting runs.Microsoft Learn DaysBetween
Work pool IDThe work pool that the cycle counting work created by the plan is assigned to.Microsoft Learn WorkPoolId
Sequence numberOn a plan line, the order in which lines are processed. Lower numbers are processed first.Microsoft Learn SequenceNumber

Test checklist

  1. Create a plan with a work pool, Maximum number of cycle counts and Days between cycle counting, and select locations (for example by Zone ID).
  2. Select Process cycle counting plan and run it.
  3. Open Warehouse management > Common > Cycle count scheduling and check the plan created counting work.
  4. Check the number of counting work records doesn't exceed the maximum, and that locations counted recently are skipped.

Source: Microsoft Learn

Functional consultant

4Setup decisions

Setup stepRecommended value and whyDecision, common mistake and test
Set up Cycle count plansOne plan per counting focus (for example high-value items in a zone), with location and product queries, a cycle counting work pool, a Maximum number of cycle counts and Days between cycle counting, processed by a recurring batch jobLearn describes plans as scheduling recurring counts for specific items or locations, controlling the work pool, the maximum number of counts per run and the days before a location is counted again, and runs them through Process cycle counting plan as a batch job.Expecting counts on a fixed calendar. Days between cycle counting runs from the last processed count: with 5 days, a count processed on day 3 makes the next count due on day 8.
Solution architect

5Design impact

Shared or per companyPer company: each legal entity has its own records. Microsoft data model
Can it be undoneReversible: Plan settings and queries can be changed at any time. Open counting work that a run already created stays until it is processed or cancelled. On-hand isn't blocked by open counting work. Microsoft Learn
Technical architect

6Technical

Menu itemWHSCycleCountPlan Checked in Dynamics 365
FormWHSCycleCountPlan Checked in Dynamics 365
TableWHSCycleCountPlanShown as “CYCLE COUNT PLANS” in Record infoKey field: CycleCountPlanIdChecked in Dynamics 365
Data entitiesWHSCycleCountingPlanEntityCycle counting plans Microsoft data model
Who can open itPrivilegesMaintain cycle counting plans WHSCycleCountPlanMaintainView cycle counting plans WHSCycleCountPlanViewDutiesMaintain warehouse planning WHSWarehousePlanningMaintainInquire into warehouse operation master WMSWarehouseOperationMasterInquire
5 security rolesField Service Integration User FieldServiceIntegrationUserProduction supervisor ProdProductionSupervisorProcess engineering manager RouteProcessEngineeringManagerWarehouse planner WHSWarehousePlannerWarehouse manager WMSWarehouseManager
Checked in Dynamics 365
Roles to set it up and use itTo set it up or change itWarehouse planner WHSWarehousePlannerTo use itWarehouse manager WMSWarehouseManagerProduction supervisor ProdProductionSupervisorProcess engineering manager RouteProcessEngineeringManagerField Service Integration User FieldServiceIntegrationUserGive people one of these roles. On this system, 5 roles can open this page.Checked in Dynamics 365
Actions on the page(Action Pane without tabs): Process cycle counting plan, Select locationsChecked in Dynamics 365
Developer

7Developer

Open it by URLhttps://<your-environment>/?mi=WHSCycleCountPlan
Integrate withWHSCycleCountingPlanEntity data entity Microsoft data model
Data migrationWHSCycleCountingPlanEntity (Cycle counting plans): loaded for each company, in Microsoft's default template 400 - Warehouse management.Load order: Microsoft's default template 400 - Warehouse management loads Cycle counting plans at execution unit 1, level 50, sequence 10. Lower levels load first, and entities at the same level load in sequence order.Load first: Warehouse work pools, the default templates at lower levels (System setup to dependency bands 30 to 90)Microsoft Learn
Table definitionWHSCycleCountPlan columns and relations Microsoft data model
Everyone