TC-CM-LEDGER-020 · Test case

Production group accounts on end journal

A test you can run to check that the setup below works.

How to run the test

Before you start
  1. Ledger posting = Production groups
  2. Production group with all Ledger-items accounts
Steps
  1. Create, start, report as finished and end a production order in the group
  2. Open the end voucher
Expected resultManufactured cost is debited and Manufactured cost, WIP credited; materials post to Cost of materials consumed and Cost of materials consumed, WIP, all from the group.
What should failWith Manufactured cost blank on the group, the end journal can't post to the ledger.