DEC-PC-MES-020 · Design decision
When should BOM materials be consumed during manufacturing execution?
Compare the options before configuring the related setup steps.
Options
ABackflush on operations: Operations Always, other stages Never. Consumption follows each operation's feedback.BBackflush on production: Report as finished Always, other stages Never. Simple, consumption at the end.CFlushing principle: Start and Operations set to Flushing principle, Report as finished Never. Each BOM line's flushing principle decides.DAt start: Start Always, other stages Never. Material is issued up front.EManual: Never on all stages. Workers post picking lists themselves.Recommendation
| Recommendation | Pick one Learn pattern per company (or per site on the by-site page) and apply it as a set; use C when BOM lines need different flushing behaviour. |
|---|---|
| Depends on |
|
| Owner | Production manager with the cost accountant |
Setup steps it affects
Source
| Source | https://learn.microsoft.com/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution |
|---|