TC-PM-OPS-090 · Test case

Post the cost of an item requirement

A test you can run to check that the setup below works.

How to run the test

Before you start
  1. PRJ-0042 is a Time and material project.
  2. CAB-200 is in stock.
Steps
  1. Create an item requirement on PRJ-0042 for 12.00 CAB-200.
  2. Post the packing slip.
  3. Open Posted project transactions for PRJ-0042.
Expected resultOne item transaction for 12.00 CAB-200 shows with the packing slip ID.
What should failBefore the packing slip is posted, no project cost exists for the line.

Setup it checks