TC-LC-SETUP-010 · Test case
Zero-cost estimate is blocked
A test you can run to check that the setup below works.
How to run the test
| Before you start |
|
|---|---|
| Steps |
|
| Expected result | Posting fails with an error that a cost of 0 can't be allocated; after updating the estimate on the auto cost, posting succeeds. |
| What should fail | With Allow zero costs = Yes, a zero price is allocated by cost area and posting succeeds. |