Published report shows actual against budget
A test you can run to check that the setup below works.
How to run the test
| Before you start | - A cost control unit, an original budget version and processed actual data
- An overhead calculation for the period
|
|---|
| Steps | - Create a configuration with Published = Yes, the cost control unit, hierarchies and the original budget version.
- Assign the calculation record to the fiscal period.
- Turn on Current period, Fixed cost, Variable cost and Total cost columns, and open the Cost control workspace.
|
|---|
| Expected result | The report shows actual, budget and variance columns for the period. |
|---|
| What should fail | Without an assigned calculation record the statement is empty. |
|---|