Electricity distributed by kWh

A test you can run to check that the setup below works.

How to run the test

Before you start
  1. A cost control unit with the policy assigned
Steps
  1. Process electricity cost on a default cost center and kWh per cost center.
  2. Create a rule for the default cost center with the Electricity base and assign the policy to the cost control unit.
  3. Run the overhead calculation and open the cost distribution calculation journal.
Expected resultThe variable electricity cost moves to the cost centers in proportion to kWh, on the same cost element.