TC-CA-POLICY-020 · Test case
Electricity distributed by kWh
A test you can run to check that the setup below works.
How to run the test
| Before you start | - A cost control unit with the policy assigned
|
|---|
| Steps | - Process electricity cost on a default cost center and kWh per cost center.
- Create a rule for the default cost center with the Electricity base and assign the policy to the cost control unit.
- Run the overhead calculation and open the cost distribution calculation journal.
|
|---|
| Expected result | The variable electricity cost moves to the cost centers in proportion to kWh, on the same cost element. |
|---|