About the examples: Examples and screenshots in this guide use BEAT, a demo company in a Dynamics 365 test environment. Use your own company's codes and values instead of copying them.
When to run it
When to run it
After loads are built and before they are released to the warehouse, so that picking locations hold enough stock for those loads.
How often
Recurring, before each load release cycle, for example once per planning cycle.
Batch settings
Run it as a recurring batch job timed before your load release.
What the output shows
Replenishment work that covers the summed demand of the selected loads after available quantity in the picking locations is subtracted. No work usually means the picking locations already hold enough stock.